Maestría en Ingeniería · 2012
Methodology for PLM implementations
The large amount of information which is created during product development, the increasing products complexity, and globalization have lead to developing Product Lifecycle management (PLM) strategies. PLM allows managing information and processes developed and conducted through the product lifecycle, connecting all the stakeholders regardless their geographic location. This strategy is supported by technological platforms which provide the means for performing the engineering processes in a collaborative way. However, the platform implementation depends on a properly strategy definition and execution. PLM strategies are widely used in the global context, nevertheless, in developing countries such as Colombia this kind of implementations are not common due to the up-front costs and the lack of knowledge and experience in the implementation process. Due to that, the presented research describes a methodology for conducting PLM strategy implementations in Small and Medium Size Enterprises (SME) of local context, based in the use of an Open Source PLM system.
Texto completo 193 páginas con texto
Leer la tesis completa Ficha en el repositorio
Contenido
- INTRODUCTIONp. 13
- 1.1 BACKGROUNDp. 13
- 1.2 RESEARCH JUSTIFICATIONp. 13
- 1.3 OBJECTIVE AND RELEVANCE OF THE RESEARCHp. 15
- 1.3.1 General objectivep. 15
- 1.3.2 Specific objectivesp. 15
- 1.3.3 Research questionsp. 15
- 1.4 RESEARCH SCOPEp. 15
- 1.5 THESIS ORGANIZATIONp. 16
- STATE OF THE ARTp. 17
- 2.1 LITERATURE REVIEWp. 17
- 2.1.1 What is PLMp. 17
- PLM Systems Evolutionp. 19
- PLM definition analysisp. 21
- PLM DEFINITIONp. 23
- Current Statusp. 25
- 2.1.2 PLM Seen as a Strategyp. 25
- 2.1.3 PLM seen as a Toolp. 26
- 2.1.4 Integration with Existing Systemsp. 28
- 2.1.5 Analysis of PLM System Requirementsp. 29
- 2.1.6 Application areasp. 32
- 2.1.7 PLM Challengesp. 33
- 2.1.8 Conclusionp. 33
- 2.2 PLM TOOLS ANALYSISp. 34
- 2.2.1 Windchill™p. 34
- 2.2.2 Teamcenter™p. 35
- 2.2.3 ENOVIA™p. 36
- 2.2.4 Aras Innovator™p. 38
- 2.3 LOCAL INDUSTRY SURVEYp. 39
- RESEARCH APPROACHp. 48
- 3.1 ACTION RESEARCH (AR) DEFINITIONp. 48
- 3.1.1 AR Cyclesp. 48
- 3.2 SOFTWARE FOR CASE STUDYp. 49
- PLM METHODOLOGY CONSTRUCTION BY AR CYCLESp. 56
- 4.1 CYCLE 1 (C1)p. 56
- 4.1.1 C1 - Planningp. 57
- 4.1.2 C1 - Actingp. 58
- 4.1.3 C1 - Observingp. 58
- 4.1.4 C1 - Reflectingp. 58
- 4.2 CYCLE 2 (C2)p. 59
- 4.2.1 C2 - Planningp. 60
- 4.2.2 C2 - Actingp. 60
- 4.2.3 C2 - Observingp. 65
- 4.2.4 C2 - Reflectingp. 66
- 4.3 CYCLE 3 (C3)p. 67
- 4.3.1 C3 - Planningp. 68
- 4.3.2 C3 - Actingp. 68
- 4.3.3 C3 - Observingp. 72
- 4.3.4 C3 - Reflectingp. 73
- 4.4 CYCLE 4 (C4)p. 74
- 4.4.1 C4 - Planningp. 74
- 4.4.2 C4 - Actingp. 76
- 4.4.3 C4 - Observingp. 78
- 4.4.4 C4 - Reflectingp. 81
- 4.5 CYCLES CONCLUSIONSp. 82
- METHODOLOGY DESCRIPTIONp. 86
- 5.1 IMPLEMENTATION MODEL: STAGE 1 (IM-S1)p. 88
- 5.1.1 (IM-S1) Current processes analysisp. 88
- (IM-S1) Analyzing the current company situationp. 89
- (IM-S1) Defining the PLM implementation strategyp. 89
- (IM-S1) Analyzing implementation prioritiesp. 89
- (IM-S1) Identifying entitiesp. 92
- (IM-S1) Identifying activitiesp. 93
- (IM-S1) Identifying rolesp. 93
- (IM-S1) Identifying the resources related to the processesp. 93
- (IM-S1) Analyzing processes’ interactionsp. 94
- (IM-S1) Modeling processesp. 94
- 5.1.1.10 (IM-S1) Analyzing processes costp. 94
- 5.1.1.11 (IM-S1) Identifying the process modifications requiredp. 95
- 5.1.2 (IM-S1) Defining KPIp. 95
- 5.1.3 (IM-S1) Reviewing formats currently usedp. 95
- 5.1.4 (IM-S1) Reviewing the naming convention currently usedp. 96
- 5.1.5 (IM-S1) Reviewing sequences and document version control currently usedp. 96
- 5.1.6 (IM-S1) Identifying software currently usedp. 96
- 5.2 IMPLEMENTATION MODEL: STAGE 2 (IM-S2)p. 96
- 5.2.1 (IM-S2) Installing and configuring the server for training purposesp. 97
- 5.2.2 (IM-S2) Introducing PLM conceptsp. 97
- 5.2.3 (IM-S2) Enabling computers from which the system will be used (Client side)p. 97
- 5.2.4 (IM-S2) Creating tutorials and support materialsp. 97
- 5.2.5 (IM-S2) Starting training sessionsp. 97
- 5.3 IMPLEMENTATION MODEL: STAGE 3 (IM-S3)p. 98
- (IM-S3) Defining implementation goals and opportunitiesp. 98
- (IM-S3) Defining priority in processesp. 98
- (IM-S3) Modeling processesp. 99
- (IM-S3) Analyzing changes implied for each rolep. 99
- 5.3.2 (IM-S3) Defining new templates and documentation standardsp. 99
- 5.3.3 (IM-S3) Defining or adapting naming convention (nomenclature) standardsp. 100
- 5.3.4 (IM-S3) Defining or adapting document version control standardsp. 100
- 5.4 IMPLEMENTATION MODEL: STAGE 4 (IM-S4)p. 101
- 5.4.1 (IM-S4) Selecting PLM tools and modules to be implementedp. 101
- 5.4.2 (IM-S4) Creating user's accounts and define roles and identitiesp. 102
- 5.4.3 (IM-S4) Defining and configuring suppliers and distributors on the systemp. 102
- 5.4.4 (IM-S4) Configuring workflows to be automated in the systemp. 102
- 5.4.5 (IM-S4) Creating libraries on the systemp. 103
- 5.4.6 (IM-S4) Developing customized modules in the systemp. 103
- 5.4.7 (IM-S4) Defining and configuring permissions on the systemp. 103
- 5.5 IMPLEMENTATION MODEL: STAGE 5 (IM-S5)p. 104
- 5.5.1 (IM-S5) Monitoring processes and running projectsp. 104
- 5.5.2 (IM-S5) Measuring KPIp. 105
- 5.5.3 (IM-S5) Comparing KPI measurementp. 105
- 5.5.4 (IM-S5) Planning corrective tasksp. 105
- 5.5.5 (IM-S5) Implementing corrective tasksp. 106
- CASE STUDYp. 107
- 6.1 STAGE1. EVALUATION AND DIAGNOSIS OF PROCESSES AND DOCUMENTATION STANDARDSp. 108
- 6.1.1 Analysis of current processes and diagnosis of approval processesp. 108
- SWOT Analysisp. 108
- Strategy definitionp. 109
- Effort – Benefit – Uncontrollable variables graphicp. 112
- Entity tablep. 114
- Activity identification chartp. 115
- Roles’ characteristics chartp. 116
- Resource chartp. 117
- R-N-I Chartp. 118
- Process modeling (AS-IS)p. 120
- 6.1.1.10 Analysis of labor costp. 121
- 6.1.1.11 Process analysis chartp. 122
- 6.1.1.12 KPI definitionp. 123
- 6.1.2 Review of currently used formsp. 125
- 6.1.3 Review of currently used naming convention (nomenclature)p. 127
- 6.1.4 Review of sequences currently used for document version controlp. 129
- 6.1.5 Identification of currently used softwarep. 129
- 6.2 STAGE2. INTRODUCTION TO PLM STRATEGYp. 129
- 6.2.1 Installation and configuration of the serverp. 129
- 6.2.2 Presentation and concepts introductionp. 129
- 6.2.3 Tutorials and supportive material developmentp. 130
- 6.3 STAGE 3. DEFINITION OF PROCESSES AND DOCUMENTATION STANDARDSp. 131
- 6.3.1 Business Process Modeling and Definition or adaptation of currently used workflowsp. 131
- Objectives, goals and opportunities chartp. 131
- Priority process chartp. 132
- Process modeling (TO-BE)p. 135
- Career plans design chartp. 136
- 6.3.2 New forms definitionp. 138
- 6.3.3 Naming convention (nomenclature) adaptationp. 139
- 6.3.4 Sequences and version management adaptationp. 140
- 6.4 STAGE 4. SYSTEM CONFIGURATIONp. 141
- 6.4.1 Selection of methods and toolsp. 141
- 6.4.2 User account creation, roles definition and identitiesp. 142
- 6.4.3 Definition and configuration of suppliers and distributorsp. 143
- 6.4.4 Workflow configurationp. 144
- 6.4.5 Permissions definitionp. 145
- 6.4.6 Library creationp. 147
- 6.4.7 Customized module developmentsp. 148
- 6.5 STAGE 5. MONITORING, EVALUATION AND DISSEMINATION OF RESULTSp. 150
- 6.5.1 Monitoring processes and running projectsp. 151
- 6.5.2 Measuring and comparing KPIp. 152
- 6.5.3 Planning corrective tasks and implementing themp. 160
- 6.6 CONCLUSIONS OF THE IMPLEMENTATION PROCESSp. 161
- 6.7 DIFFICULTIES RELATED TO THE SYSTEM IMPLEMENTATIONp. 162
- CONCLUSIONSp. 164
- Figure 1.Serial process (PLM Technology Guide, 2010)p. 19
- Figure 2.Actual PLM Systems (PLM Technology Guide, 2010)p. 20
- Figure 3.PLM as a toolp. 27
- Figure 4. Interoperabilityp. 29
- Figure 5. TeamCenter architecturep. 36
- Figure 6. ENOVIA architecturep. 37
- Table 4. Company’s descriptionp. 41
- Figure 7.Companies ratingp. 43
- Figure 8. 11 Companies’ Product Design Processp. 44
- Figure 9. Action Research Cyclesp. 49
- Figure 10. “Project” module interfacep. 50
- Figure 11. Product structure browser explanationp. 51
- Figure 12. Item types associationp. 53
- Figure 13.Version control codep. 54
- Figure 14. Aras Innovator® interfacep. 55
- Figure 15. AR Cycles implementedp. 56
- Figure 16. Implementation stages in Cycle 1p. 59
- Figure 17. Project Schedule in Aras Innovator for Cycle 2p. 62
- Figure 18.Project’s permissions for Cycle 2p. 62
- Figure 19. Document’s permissions for Cycle 2p. 63
- Figure 20.Meeting’s permissions for Cycle 2p. 63
- Figure 21. Part’s permissions for cycle 2p. 64
- Figure 22. Naming convention (nomenclature) for documents management in cycle 2p. 64
- Figure 23. Naming convention (nomenclature) for CAD management in Cycle 2p. 65
- Figure 24. Indicators measured in Cycle 2 and results obtainedp. 66
- Figure 25.Implementation stages for Cycle 2p. 67
- Figure 26. Project Schedule for packaging sub-project in Cycle 3p. 70
- Figure 27.Project Schedule for sewing sub-project in Cycle 3p. 71
- Figure 28.Naming convention (nomenclature) used for document management in Cycle 3p. 71
- Figure 29.PLM blog for training purposesp. 72
- Figure 30. Indicators measured in Cycle 3 and results obtainedp. 72
- Figure 31.Implementation stages for Cycle 3p. 74
- Figure 32. Product Design process scheme for C4p. 75
- Figure 33.Lifecycle states for “Document”, “part” and “project” functions in C4p. 76
- Figure 34. Document naming convention (nomenclature) definition for C4p. 76
- Figure 35.Instructive documents on the PLM systemp. 77
- Figure 36. Stage definition for Project on Aras Innovator for C4p. 78
- Figure 37. Organizational chart used in Cycle 4p. 78
- Figure 38.Evolution of PLM implementation for Cycle 4p. 80
- Figure 39. Activity report performance for Stage 4 on Cycle 4p. 81
- Figure 40. Comparison of PDU, PDCN, PPUD and PART by Cyclep. 84
- Figure 41. Comparison of PDD, PDNU and PARM by Cyclep. 84
- Figure 42.Stages of PLM implementation methodologyp. 86
- Figure 43. Scheme of the Benefit-Effort-Uncontrollable Variables graphicp. 92
- Figure 44.Organizational chart of the companyp. 107
- Figure 45. Effort – Benefit – Uncontrollable variables graphicp. 114
- Figure 46. Revision (preventive maintenance) processp. 120
- Figure 47. Preventive and corrective maintenance form fields identificationp. 125
- Figure 48. Company’s document pyramidp. 127
- Figure 49. AS-IS company’s documents naming convention (nomenclature)p. 128
- Figure 50. Support material for training processesp. 131
- Figure 51. Changes defined for “revision” processp. 136
- Figure 52. Instructive document formp. 139
- Figure 53. Naming convention (nomenclature) automationp. 139
- Figure 54. Example of “Version Control” in Aras®p. 140
- Figure 55. Users and identities definition in ARAS Innovator®p. 142
- Figure 56. Suppliers list in Aras innovator®p. 143
- Figure 57. Life-cycle developed for “Suppliers” in Aras innovator®p. 144
- Figure 58. Lifecycle definition based on the entity chartp. 145
- Figure 59. Machines and areas listp. 147
- Figure 60.Suppliers form developed in PLM systemp. 148
- Figure 61. Customized module developed in Aras Innovator® (Test version)p. 149
- Figure 62. Code developed for “Failure rates graph” in a test versionp. 149
- Figure 63. Preventive maintenance schedule in execution in Aras Innovator®p. 151
- maintenance memberp. 153
- Figure 66. Activity completion report measured by maintenance memberp. 154
- Figure 68. Evolution of the activity report process of the preventive maintenance formatp. 155
- Figure 69. Evolution of the activity completion report process (PART indicator)p. 155
- weekp. 152
- maintenance memberp. 156
- Figure 72. Evolution of activity completion report (PART indicator) per maintenance membersp. 157
- per weekp. 157
- Figure 74. Comparison of average failure rate before and after implementationp. 158
- Figure 76. Comparison of the total average time in repairing before and after implementationp. 159
- maintenance before and after implementationp. 159
- maintenance before and after implementationp. 160
- Figure 79. Blue screen in the “Methods editor”p. 163
- Figure 80. Company 1’s Design processp. 174
- Figure 81. Company 2’s Design processp. 175
- Figure 82. Company 3’s Design processp. 176
- Figure 83. Company 4’s Design Processp. 177
- Figure 84. Company 5’s Design Processp. 178
- Figure 85. Company 6’s Design Processp. 179
- Figure 86. Company 7’s Design Processp. 180
- Figure 87. Company 8’s Design Processp. 181
- Figure 88. Company 9’s Design Processp. 182
- Figure 89. Company 11’s Design Processp. 183
- Table 1. Analysis of PLM definitionsp. 23
- Table 2. Classification tools (Mejía et al., 2008)p. 26
- Table 3. Summary of systems analysis requirementsp. 31
- Table 5.Survey items analyzedp. 42
- Table 6.Results of the comparison of product design activities in companiesp. 44
- Table 7.Decision making process in product design and development processp. 45
- Table 8.Detail design activities per companyp. 47
- Table 9.Number of participants per groupp. 75
- Table 10.Indicators measured for Cycle 4p. 79
- Table 11. Evolution of indicators for Cycle 4p. 80
- Table 12. Comparison of indicators by Cyclep. 82
- Table 13. Descriptive information for “permission definition table”p. 104
- Table 14. Proposed indicators for measuring the “level of use” of the PLM toolp. 105
- Table 15. Implementation teamp. 108
- Table 16. SWOT Analysis table examplep. 109
- Table 17.Definition of objectives and activities for the PLM implementationp. 110
- Table 18. Effort estimation table for objective 1p. 112
- Table 19. Benefit estimation tablep. 113
- Table 20.Uncontrollable variables estimationp. 113
- Table 21.Entity table for “Revision” entityp. 115
- Table 22. Activity identification chart for “revision” entityp. 116
- Table 23.Roles’ characteristics chartp. 117
- Table 24.Resource chart examplep. 118
- Table 25.R-N-I chart for “Revision” entityp. 119
- Table 26.AS IS: Revision processp. 121
- Table 28.Process analysis chart fragment for “revision” entityp. 123
- Table 29. KPI for diagnosis processesp. 124
- Table 30.Corrective maintenance form analysis chartp. 126
- Table 31.Preventive maintenance form analysis chartp. 126
- Table32. Goals and opportunitiesp. 132
- Table 33. Process benefit estimationp. 133
- Table 34. Nomenclature for Table 33p. 133
- Table 35. Process priority tablep. 134
- Table 36. Nomenclature and definition of items for Table 35p. 134
- Table 39.Permissions defined for “Instructive documents function”p. 146
- Table 40.Corrective actions conducted during the monitoring processp. 152
- Table 41. Data base Engine requirementsp. 170
- Table 42. Operating system server side requirementsp. 171
- Table 43. Software requirementsp. 172
- Table 44. Additional requirementsp. 173
- Table 45. SWOT Analisis tablep. 184
- Table 46. Strategy definition tablep. 184
- Table 47. Effort estimation tablep. 185
- Table 48. Rating scale based on percentage tablep. 185
- Table 49. Benefit estimation tablep. 186
- Table 50. Uncontrollable variable estimationp. 186
- Table 51. Entities tablep. 186
- Table 52. Activity identification tablep. 187
- Table 53. Roles’ characteristic tablep. 187
- Table 54. Resources tablep. 188
- Table 55. R-N-I tablep. 188
- Table 56. Resources correlation tablep. 189
- Table 57. Process analysis tablep. 189
- Table 58. Form analysis tablep. 189
- Table 59. Objectives, goals and opportunitiesp. 190
- Table 60. Process benefit estimation tablep. 190
- Table 61. Process priority estimation tablep. 190
- Table 63. Permission definition tablep. 192