Maestría en Ingeniería · 2021
Microestructura y propiedades mecánicas de las fases fundamentales del Clinker
Due to the high importance of the cement between the construction material, in the present work the micromechanical properties of the main clinker phases was determined. There was an initial investigation of the history and fabrication of the Clinker, the function of each of its phases, and its hydration process, concluding that the alite and the belite are the phases that provides the mechanical resistance to the hydrated cement therefore the phases to which their resistance was analyzed. For a reference the hardness of previous research works was sought for both phases. For the experimental part the samples of clinker rock were prepared, were embedded in epoxy and polished carefully, different attack chemicals were searched for the phase differentiation, once the identification was achieved, the Vickers hardness test was performed with a micro-hardness tester, with a pyramid-shaped diamond indenter with a square base, it is explained how to obtain the ideal load at which this material should be indented. Once the indentations were completed, a data analysis was performed by means of a onefactor analysis of variance, where the hardness values obtained were concluded to be valid, which additionally are in accordance with those found in the literature and are the following: HvAlita=9.26GPa y HvBelita=7.03GPa. In addition to the hardness, apparent fracture toughness was analyzed, for which very scattered data were obtained, especially in belite where fractures did not occur in the corners.
Texto completo 34 páginas con texto
Leer la tesis completa Ficha en el repositorio
Contenido
- RESUMENp. 4
- Abstractp. 4
- OBJETIVOSp. 5
- Objetivo Generalp. 5
- Objetivos Específicosp. 5
- INTRODUCCIÓNp. 6
- ESTADO DEL ARTEp. 7
- Origen del cementop. 7
- Proceso de fabricación del clinkerp. 7
- Componentes del clinkerp. 9
- Proceso de hidratación del clinkerp. 11
- Etapa I, pre-inducción:p. 13
- Etapa II, inducción o periodo durmiente:p. 13
- Etapa III, Post-inducción:p. 14
- Etapa IV, Desaceleración:p. 14
- Etapa V, Difusión estacionaria:p. 14
- Clinker en el microscopio ópticop. 14
- Propiedades micromecánicas de la Alita y la Belita de artículos previosp. 15
- PREPARACIÓN DE LAS MUESTRAS Y METODO DE ENSAYOp. 18
- Preparación de las muestrasp. 18
- Ensayo de durezap. 19
- RESULTADOS Y DISCUSIÓNp. 26
- CONCLUSIONESp. 32
- REFERENCIASp. 33
- Figura 1- Reacciones de formación de los compuestos del clinkerp. 9
- Figura 2 - Estructuras cristalinas de la Alita y la Belita Ca (verde), O (rojo), Si (amarillo). [9]p. 10
- hidróxido de calcio, ip= CSH producto interno, op= CSH producto externo [12]p. 12
- Figura 4 - Esquema de hidratación del cemento [13]p. 12
- Figura 5 - Curva de calorimetría del cemento [13]p. 13
- Figura 6 - Chuanlin Hu, Zongjin Li [22]- Fig. 2. Formulas (3), (4) y (5)p. 17
- Figura 7 - Preparación de la muestra en resina epóxica rígidap. 18
- Figura 8 - Clinker sin hidratarp. 19
- Figura 9 - Clinker hidratadop. 19
- Figura 10 - Micro-durómetro Wilson modelo: 401MVDp. 20
- Figura 11 - Huella en belita con carga de 100gp. 20
- Figura 12 - Curva de Dureza vs Carga de indentación - Alitap. 21
- Figura 13 - Curva de Dureza vs Carga de indentación – Belitap. 22
- Figura 14 - Aglomeración de Alitasp. 22
- Figura 15 - Aglomeración de Belitasp. 23
- Figura 16 - Indentación Alita 100gr Figura 17 -Indentación Belitas a 100grp. 23
- Figura 18 - Indentación Alita 50gr Figura 19 - Indentación Belita 50grp. 24
- Figura 20 - Indentaciones con 10gr en muestras de 21 días de hidrataciónp. 25
- Figura 21 - Clinker 2 después del ataque donde se pueden diferenciar las fasesp. 26
- (derecha)p. 27
- Figura 23 - Indentación Alita 200gr Figura 24 - Indentación Belita 200grp. 27
- Figura 25 - Esquema indentación con 100g y con 200gp. 28
- Figura 26 - Alita con carga 50gr, grietas en las esquinas de 5,4m, 11,4m, 7,1m y 12,1mp. 30
- grieta sin medida que atraviesa la huellap. 31
- Tabla 1 - Nomenclatura del cementop. 10
- Tabla 2 - Energía de hidratación de la alita, belita, celita y felita [11]p. 11
- Tabla 3 - Ataques quimicos para la identificacion de las fases del clinker [17]p. 15
- Tabla 4 - Datos obtenidos por Velez, et al. [20]p. 16
- Tabla 5 - Datos obtenidos por Wilson, et. al [21]p. 16
- Tabla 6 - Dureza de las fases del cemento hidratadop. 17
- Tabla 7 - Análisis de varianza Alita con carga de 100grp. 28
- Tabla 8 - Análisis de varianza Belita con carga de 100grp. 29
- Tabla 9 - Resultados de dureza para la carga de 100grp. 29
- Tabla 10 - Factores de varianza carga 50grp. 29
- Tabla 11 - Resultados de dureza para la carga de 50grp. 30
- Tabla 12 - Resultados de tenacidad a la fractura para la carga de 50grp. 30