Maestría en Administración Financiera · 2022
Análisis comparativo para el desarrollo de proyectos hidroeléctricos en Colombia : Project Finance versus ejecución dentro de balance
The construction of hydroelectric plants in Colombia has traditionally been carried out by established players in the electric sector that use their assets as collateral to finance new projects. However, given the high risk that hydroelectric projects present, investors are evaluating alternative mechanisms such as Project Finance. This document studies, from a financial perspective, the main differences, advantages, and disadvantages of developing a hydroelectric project within a company balance sheet and under Project Finance in Colombia. A simplified financial modeling of the two schemes is also presented in the study, finding that projects executed within the balance sheet generate a higher rate of return for the investor. The study also concludes that incentives, such as Law 1715, for the development of renewable energy projects are more effective if the projects are executed within the balance sheet of the company.
Texto completo 156 páginas con texto
Leer la tesis completa Ficha en el repositorio
Contenido
- INTRODUCCIÓNp. 13
- MARCO TEÓRICOp. 15
- Energía y electricidadp. 15
- Conceptos básicos sobre energía eléctricap. 15
- Propiedades de la energía eléctrica con implicaciones prácticasp. 16
- Cadena de suministro energía eléctricap. 17
- Demanda de energía eléctricap. 18
- Oferta de energía eléctricap. 21
- Fuentes de energía y tipos de centrales de generaciónp. 21
- Centrales hidroeléctricasp. 22
- Matriz energéticap. 23
- Capacidad instalada que debe tener la ofertap. 25
- Mercado de energía eléctricap. 27
- Mercado de corto plazo o “spot”p. 28
- Mercado de largo plazo o contratos bilateralesp. 28
- Imperfecciones y restricciones del mercado de energía eléctricap. 30
- Operación del sistema eléctricop. 32
- Estructura institucional del mercado eléctrico colombianop. 33
- Principales características del mercado de energía eléctrica en Colombiap. 35
- Estructura tarifariap. 38
- Precio de bolsap. 40
- Contratos bilateralesp. 44
- Cargo por Confiabilidad (CxC)p. 47
- Demanda de energía eléctrica en Colombiap. 48
- Oferta de energía eléctrica en Colombiap. 51
- Ingresos de los generadores en Colombiap. 52
- Egresos de los generadoresp. 57
- Capital Expenditure (CAPEX)p. 57
- Estimación de CAPEX para proyectos hidroeléctricosp. 59
- CAPEX de sostenimientop. 62
- Operating Expenditures (OPEX)p. 63
- Costos AOMp. 64
- Esquema tradicional de desarrollo de centrales hidroeléctricas en Colombiap. 68
- Etapa de identificaciónp. 68
- Etapa de prefactibilidadp. 69
- Etapa de factibilidadp. 69
- Diseño de detalle y licenciamiento ambientalp. 70
- Contratación de los trabajosp. 70
- Esquema tradicional de financiamiento y ejecución de los trabajosp. 71
- hidroeléctricosp. 72
- Desarrollo de proyectos hidroeléctricos bajo esquemas Project Financep. 73
- Vehículos para propósitos especiales (SPV)p. 79
- Contratos EPC en proyectos hidroeléctricosp. 79
- Contratos bilaterales de venta de energía (PPA) bajo esquemas Project Financep. 83
- Comparación entre el esquema tradicional y el Project Finance-EPCp. 84
- mundialp. 86
- desarrollop. 85
- La evaluación financiera de proyectosp. 92
- de balance y bajo Project Financep. 93
- METODOLOGÍAp. 102
- Estado de resultados central hidroeléctricap. 103
- Construcción del flujo de caja libre y el flujo de caja del inversionistap. 103
- Modelación financierap. 105
- Principales variablesp. 105
- Variables técnicasp. 106
- Variables asociadas al desarrollo y la construcciónp. 109
- Variables durante la operaciónp. 114
- Variables comercialesp. 115
- Variables macroeconómicasp. 117
- Variables financierasp. 121
- Caso base y valores de las variables de estudiop. 125
- RESULTADOSp. 128
- Estado de resultados y tasa de retorno del inversionista para el caso basep. 128
- Valor del CAPEX bajo los dos esquemas de desarrollop. 130
- Flujo de caja bajo los dos esquemas de desarrollop. 131
- Efectos de la Ley 1715 - Depreciación aceleradap. 133
- Análisis de sensibilidadp. 135
- Esquema dentro de balancep. 134
- Esquema Project Financep. 102
- Análisis de sensibilidad y aplicación beneficios Ley 1715p. 142
- Análisis de sensibilidad y variables estresadas indirectamentep. 145
- Tasas de retorno obtenidas y el WACCp. 146
- CONCLUSIONES Y RECOMENDACIONESp. 147
- 6. REFERENCIASp. 152
- 7. APÉNDICE Ap. 156
- Figura 1. Comportamiento de la demanda en un díap. 19
- Figura 2. Curva de demanda diariap. 20
- Figura 3. Estructura institucional del mercado eléctrico colombianop. 35
- Figura 4. Mercado “spot” Colombia-Formación precio de bolsap. 41
- liquidaciónp. 43
- Figura 6. Precio energía mercado “spot” y contratos enero de 2020 a julio de 2021p. 44
- asignaciónp. 45
- Figura 8. Duración de los contratos de largo plazo por año de solicitudp. 46
- Figura 9. Comportamiento de la demanda anual en Colombia GWhp. 51
- Figura 10. Principales conceptos transados en el ASIC, año 2019p. 53
- Figura 11. Rango de costos de CAPEX por paísesp. 60
- Figura 12. Costos de operación por KWh por tecnología de generaciónp. 63
- Figura 13. Frecuencia y magnitud de sobrecostos por tipo de tecnología de generaciónp. 73
- Figura 14. Estructura contractual Project Financep. 76
- Figura 15. Project Finance-número de proyectos y desembolsosp. 86
- Figura 16. Project Finance-Financiamiento de proyectos de infraestructura por sectorp. 87
- Figura 17. “Spread” sobre LIBOR en deuda de proyectos ejecutados bajo Project Financep. 91
- Figura 18. Comparación Project Finance y esquema dentro de balancep. 97
- inversión (central de generación)p. 100
- amortización de capital. Esquemas Project Finance y dentro de balancep. 135
- Figura 23. Análisis de estrés-Esquema de desarrollo Project Financep. 141
- Tabla 1. Tarifa servicio de energía-componentes CUp. 39
- tensión 2 en diciembre de 2010p. 40
- Tabla 3. Demanda de energía por tipos de mercadop. 50
- pequeñas centralesp. 60
- Tabla 5. Rangos de costos principales como porcentaje del CAPEX de construcciónp. 60
- Tabla 6. Principales componentes del CAPEXp. 61
- Tabla 7. Conceptos de costo de operación y mantenimiento AOMp. 64
- Tabla 8. Costos de ley y operación del sistema en Colombiap. 65
- Tabla 9. Impuestos plantas hidroeléctricas en la etapa de operaciónp. 67
- Financep. 85
- Colombiap. 103
- Tabla 13. Principales variables en el desarrollo de proyectos hidroeléctricosp. 106
- Tabla 14. Distribución porcentual de los conceptos de CAPEX de construcciónp. 113
- Tabla 15. Porcentaje ejecución de fondos por año de construcciónp. 113
- Tabla 16. Beneficios Ley 1715p. 120
- Tabla 17. Caso base. Variables y valores de las variablesp. 125
- Tabla 18. Tasa de retorno del inversionista y los efectos de los beneficios de la Ley 1715p. 134
- la tasa de retorno del inversionistap. 139
- Tabla 21. Análisis de estrés-Esquema de desarrollo Project Financep. 140
- Impacto de cada variable sobre la tasa de retorno del inversionistap. 142
- impacto entre variablesp. 144