Ingeniería de Sistemas · 2016
Desarrollo de una herramienta de gestión de laboratorios mediante la aplicación de procesos con notación BPMN
Starting from the need to define business processes, was established as a general objective of this project define LIUSB processes (because it did not exist), to model in BPMN and from these diagrams, define the requirements for developing a control tool loans and inventory. Which is expected to be used and paper usage control is replaced. The tool developed, subsequently validated in a controlled environment to make the necessary improvements. It is important that the reader of this paper grade has basic knowledge of BPMN 2.0 and software engineering.
Texto completo 88 páginas con texto
Leer la tesis completa Ficha en el repositorio
Contenido
- GLOSARIOp. 9
- RESUMENp. 11
- INTRODUCCIÓNp. 12
- PLANTEAMIENTO DEL PROBLEMA Y JUSTIFICACIÓNp. 13
- OBJETIVOSp. 14
- MARCO CONCEPTUAL Y ESTADO DE ARTEp. 15
- MARCO METODOLÓGICOp. 18
- SELECCIÓN DE MOTOR DE BASE DE DATOSp. 18
- SELECCIÓN DE HERRAMIENTA DE DESARROLLOp. 18
- SELECCIÓN DE METODOLOGÍA ÁGIL DE DESARROLLOp. 18
- FASES DEL PROYECTOp. 20
- ANÁLISIS Y LEVANTAMIENTO DE REQUISITOS DEL SOFTWAREp. 20
- Levantamiento Informaciónp. 20
- Modelamiento de Procesos BPMNp. 21
- Planificación de Iteraciones de Desarrollop. 49
- Especificación de Requisitosp. 49
- Roles del Sistemap. 53
- Casos de Usop. 54
- Especificación Caso de Usop. 59
- DISEÑOp. 63
- Modelo de Datos del Softwarep. 64
- Diagramas de Secuenciap. 65
- Arquitecturap. 66
- Prototiposp. 67
- Diagrama de Paquetesp. 69
- DESARROLLOp. 69
- Tecnologías usadasp. 69
- Patrones de diseñop. 71
- Matriz de Dispersión Funcionalp. 72
- PRUEBASp. 73
- Diseño de Pruebasp. 73
- Ejecución de Pruebasp. 80
- CONCLUSIONES Y RESULTADOSp. 82
- CONCLUSIONESp. 82
- RESULTADOSp. 83
- TRABAJOS FUTUROSp. 85
- BIBLIOGRAFÍAp. 86
- ANEXOSp. 88