Tecnología en Topografía
Topografía Aplicada A Obra Vertical Y Horizontal En Usme
The present document evidences the activities carried out in the development of the internship using the topography applied in the civil works in a detailed way; consequently, the different tasks carried out in the civil works Reserve of San David-Usme are presented, it should be noted that the work began 3 years ago, therefore, had a significant progress. The internship lasted for 4.26 weeks with a duration of 45 hours per week, with a start date of April 16. For the above, a record of the activities carried out in the internship was carried out, allowing to gather the explanation found in this document. The registration consists mainly of taking photographs, preparing reports and tables that allow you to collect the information in an appropriate manner for later presentation
Full text 39 pages with text
Read the full thesis Record in the repository
Contents
- 1.1 OBJETIVO GENERAL………………………………………………………p. 11
- 1.2 OBJETIVOS ESPECÍFICO…………………….……………………………p. 11
- 2.1 TOPOGRAFÍA………………………………………………………..………p. 12
- 3.1.1 Cronograma de actividades………………………………………………p. 16
- Tabla 1. Cuadro de resumen (cantidad)p. 15
- Tabla 2 Coordenadas de puntos de controlp. 19
- Tabla 3 Control de asentamientos tanque super lote 2p. 24
- Tabla 4 Control de asentamientos de salón comunal SPL 2p. 25
- Tabla 5 Control de asentamientos salon comunal super lote 2p. 25
- Tabla 6 Control de asentamientos de parqueadero SPL 2p. 26
- Tabla 7 Control de asentamiento Tanque SPL1p. 27
- Tabla 8 Control de asentamiento salón Comunal SPL1p. 27
- Tabla 9 Nivelacion para filtro de aguap. 27
- Tabla 10 Puntos de controlp. 28
- Tabla 11 Control de asentamientos generalp. 30
- Tabla 12 Puntos de controlp. 30
- Tabla 13 Coordendas y cotas para control de asentamientos MTAp. 32
- Tabla 14 Nivelacion y contra nivelacion de Muros de Tierra Armadap. 33
- Tabla 15 Puntos de control de asentamientosp. 34
- Tabla 16 Control de asentamientos Muro de contencionp. 35
- Fotografía 1 Reserva San David- Tomado de Dronp. 14
- Fotografía 2 Reserva San David, Tomado de Dronp. 14
- Fotografía 3 Tanque super lote 2p. 17
- Fotografía 4 niveleta Tanque super lote 2p. 17
- Fotografía 5 Zona de control ambientalp. 17
- Fotografía 6 Replanteo de zona de control ambientalp. 17
- Fotografía 7 Referenciap. 18
- Fotografía 8 Cuentas para drenaje de aguas lluviasp. 18
- Fotografía 9 Replanteo de red residualp. 19
- Fotografía 10 Tanque super lote 1p. 20
- Fotografía 11 Salón Comunal Super Lote 2p. 20
- Fotografía 12 Puntos de controlp. 21
- Fotografía 13 Limites de Reserva San David- Colegio Ofelia Acosta Uribep. 21
- Fotografía 14 Levantamiento topográficos de cañuelas existentesp. 22
- Fotografía 15 Levantamiento cañuelas para drenajep. 22
- Fotografía 16 Reserva San Davidp. 22
- Fotografía 17 Delta Vía V7p. 23
- Fotografía 18 Delta para levantamientop. 23
- Fotografía 19 Parqueadero eje 3-4p. 23
- Fotografía 20 Parqueadero 3-4p. 23
- Fotografía 21 Tanque super lote 2p. 24
- Fotografía 22 Chequeo Estación Totalp. 28
- Fotografía 23 Chequeo Nivel Automáticop. 28
- Fotografía 24 Levantamiento topográfico de filtro parqueaderop. 29
- Fotografía 25 Verticalidad Parqueadero Super lote 2p. 29
- Fotografía 26 Levantamiento Topográfico Parqueadero Super lote 2p. 31
- Fotografía 27 Muro de contenciónp. 35